Arcelor Mittal
2017 - Dunkirk, France - SidérurgieBF#3 140t robot gunning of the stack
-
JAN DE NUL
2017 - Oostende, Belgium - Autres secteursShotcreting de 2 socles dans le port
-
DK Recycling
2017 - Duisburg, Germany - SidérurgieBF#3 Demolition of the existing lining from level +11m to +20m, shotcreting of 80 tons of refractory concrete.
-
Arcelor Mittal
2017 - Bremen, Germany - SidérurgieBF#2 Complete repair, partial demolition of the top cone, casting of concrete in the hearth, ramming of staves, injection, repair of offtakes & downcomer, shotcreting of the tuyere belt.
-
Sodraep
2017 - Uccle, Belgium - Autres secteursGunitage d’un bassin d’orage
-
Arcelor Mittal
2016 - Dunkirk, France - SidérurgieBF#4 Gunning and ramming of the salamander runners, cleaning and gunning (of 200t) of the stack lining using a mobile platform; ramming staves' joints and backfilling between staves & shell (4 rows of staves).
-
Salzgitter AG
2016 - Germany - SidérurgieBF#A Hot repair in the connection between the bustle pipe and the hot blast main.
-
Arcelor Mittal
2016 - Annaba, Algeria - SidérurgieBF#2 Welding of the anchors and gunning in the bustle pipe, ramming staves' joints and backfilling between staves & shell (10 rows of staves), gunning of the top cone.
-
ROGESA - Dillinger Hütte
2016 - Dillingen, Germany - SidérurgieBF#4 Demolition of the existing lining in the old down comer comer with special platform. Welding and gunning in the new down comer. Cleaning and gunning the stack lining using a mobile platform; ramming staves' joints and backfilling between staves & shell. Repair in the uptakes & offtakes.
-
Arcelor Mittal
2016 - Eisenhüttenstadt, Germany - SidérurgieBF#5 Complete revamping of the refractory lining in all the gas cleaning equipment (demolition, welding anchors, sandblasting, painting, gunning). Cleaning, gunning and shotcreting of the stack lining using a mobile platform; ramming staves' joints and backfilling between staves & shell. Complete repair of the top cone and casting behind the throat armor.