DK Recycling
2017 - Duisburg, Germany - SidérurgieBF#3 Demolition of the existing lining from level +11m to +20m, shotcreting of 80 tons of refractory concrete.
-

Arcelor Mittal
2017 - Bremen, Germany - SidérurgieBF#2 Complete repair, partial demolition of the top cone, casting of concrete in the hearth, ramming of staves, injection, repair of offtakes & downcomer, shotcreting of the tuyere belt.
-
Arcelor Mittal
2016 - Eisenhüttenstadt, Germany - SidérurgieBF#5 Complete revamping of the refractory lining in all the gas cleaning equipment (demolition, welding anchors, sandblasting, painting, gunning). Cleaning, gunning and shotcreting of the stack lining using a mobile platform; ramming staves' joints and backfilling between staves & shell. Complete repair of the top cone and casting behind the throat armor.
-

Arcelor Mittal
2016 - Dunkirk, France - SidérurgieBF#4 Gunning and ramming of the salamander runners, cleaning and gunning (of 200t) of the stack lining using a mobile platform; ramming staves' joints and backfilling between staves & shell (4 rows of staves).
-

Salzgitter AG
2016 - Germany - SidérurgieBF#A Hot repair in the connection between the bustle pipe and the hot blast main.
-

Arcelor Mittal
2016 - Annaba, Algeria - SidérurgieBF#2 Welding of the anchors and gunning in the bustle pipe, ramming staves' joints and backfilling between staves & shell (10 rows of staves), gunning of the top cone.
-

ROGESA - Dillinger Hütte
2016 - Dillingen, Germany - SidérurgieBF#4 Demolition of the existing lining in the old down comer comer with special platform. Welding and gunning in the new down comer. Cleaning and gunning the stack lining using a mobile platform; ramming staves' joints and backfilling between staves & shell. Repair in the uptakes & offtakes.
-

Salzgitter AG
2015 - Germany - SidérurgieBF#5 Cleaning and gunning of stack lining using a mobile platform; ramming of stave joints; injection between staves & shell; casting works on runners and covers, cleaning of dust catcher, washer and down comer.
-

Arcelor Mittal Gent
2015 - Gent, Belgium - SidérurgieBF#A Refractory demolition and 120t gunning, 33.000 anchors, gas cleaning installation.
-

Arcelor Mittal
2014 - Galati, Romania - SidérurgieRemove burden, burden cap, cleaning and gunning stack lining and tuyeres area, using a mobile platform, casting behind the armor plates, gunned repair of dust catcher