ARCELORMITTAL

    2013 - France, Fos - Sidérurgie

    BF#1 Cyclone repair

  • ARCELORMITTAL

    2013 - France, Dunkirk - Sidérurgie

    BF#4 Welding anchors and complete gunning of the line between the cyclone and scrubber

  • ARCELORMITTAL

    2013 - Poland, Katowice - Sidérurgie

    BF#2 Remove burden through tuyeres, install insulation plug, introduce mobile platform, clean stack, gunning stack lining and tuyere area by dry way 230t, remove hot burden to below tuyere level to allow tap hole repair

  • DILLIGER HUTTE

    2013 - Germany, Dilligen - Sidérurgie

    BF#5 Remove burden through tuyeres, install insulation plug, introduce mobile platform, clean stack, ram joints between staves, shotcrete protection lining break insulating plug, create connection to tapholes, injection behind staves

  • Arcelor Mittal

    2013 - Gent, Belgium - Sidérurgie

    Isolation of stoves for hot repairs

    ARCELORMITTAL

    2013 - Belgium, Gent - Sidérurgie

    BF#B Isolation of the stoves for hot repair

  • ARCELORMITTAL

    2012 - France, Dunkirk - Sidérurgie

    BF#4 Remove burden through tuyeres; clean inside, and gunned protection using mobile platform; gunned repair of down-comer elbow

  • TATA STEEL

    2012 - UK, Port Talbot - Sidérurgie

    BF#5 Gunning of uptakes down-comer and top cone

  • TERNIUM SIDERAR

    2012 - Argentina, San Nicolas - Sidérurgie

    BF#2 Cleaning walls and tuyere area, ramming of new stave joints and injection between staves and shell

  • ARCELORMITTAL

    2012 - Roumania, Galati - Sidérurgie

    BF#3 Remove burden; clean furnace interior, gunned repair to dust-catcher